Construction started with the making of a strong
platform ,seated on concrete pillars to enable airflow under the
building. |
| With the floor completed the stud walling could
begin and we were able to make use of the client's own windows. |
 |
 |
In this instance polystyrene insulation was packed
between the stud work, prior to MDF lining being fitted. |
| The building was in two sections, one part office
and the other a room for the client's dogs. This picture shows a purpose
made 'dog hatch'. |
 |
 |
Internal MDF lining, which was subsequently painted
white, allowed for plenty of power points in the office. |
| The finished building, clad in pressure treated
tanilised wany edged timber. |
 |